Development & New Unique Construction Preparations

Mar 13, 2021
3 min read

Updated: 5 days ago

In short, when you’re getting ready to break ground or to add on, you want to make sure every detail is lined up for a smooth transition from normal, to disarray and turning into a better, new normal. We prepare your home for the construction ahead. Floor pads, dust barriers, window blocks and much more.


Equally important, we’re experts at blending art with science to determine the highest and best use of your property site – we oversee all aspects of R&D from soil to final occupancy – so you are in good hands.


In fact, our highly-skilled technicians finesse all of your fine fit and finish plans, easily readying your property for inhabitance.


Most Importantly, no matter what the service is, we can tailor it to your needs on a time and materials basis.


Unique Services Of Repair & Reconstruction

In case you are facing a crisis; weather it is Fire, flood, mold, knife-jawed critters gnawing through your deck.


By all means, our in-house team handles all of the above, and more.


In other words, from evaluation and testing through remediation, repair, and reconstruction, we take you from despair to relief in the shortest time possible.


In essence, we seek to solve the root of the problem, maintaining quality standards the whole way through.



The work that happens before anyone builds anything

On any project larger than a repair, the money is made or lost before the first day on site. Pre-construction is not paperwork, it is the part that decides the schedule and most of the cost.

Feasibility, in the order that matters

  1. Jurisdiction. Which city, or whether the parcel is unincorporated county. This is not always the mailing address and it changes every department you will deal with

  2. Zoning. What is permitted, what setbacks apply, what the height limit is, and what the lot coverage allows

  3. Overlays. Fire hazard severity zone, hillside, preservation, specific plan. Each one adds requirements the base zoning does not mention

  4. Utilities. What exists, what capacity it has, and what connection fees apply

  5. Soil. On expansive clay, the geotechnical answer precedes the structural design rather than following it

  6. Access. How material and equipment reach the work, which quietly decides a great deal

Every one of those can change the design. Finding them in that order costs phone calls. Finding them out of order costs drawings.

Where projects actually lose time

  • An incomplete submittal, which starts a correction cycle before review has really begun

  • A discretionary approval nobody knew was required, which runs on a hearing calendar rather than a counter

  • A utility upgrade discovered late, because utility timelines are not construction timelines

  • An HOA approval started after the city submittal instead of alongside it

  • Long-lead items ordered when they are needed rather than when they are known

Understanding how the department actually processes a project removes most of this: the Department of Building and Safety.

Sequence is the deliverable

For any multi-trade project, the order of operations is worth more than any single line item, because doing things in the wrong order is what causes work to be done twice. The clearest worked example is a backyard, where six trades touch the same ground: planning a backyard in Riverside County.

The principle generalizes: everything that goes underground before anything covers it, everything structural before anything finished, and every approval track started at the same time rather than in a queue.

What we produce before construction

  • Confirmation of jurisdiction, zoning and applicable overlays

  • The list of permits and approvals, and which agency issues each

  • Identification of what is likely to be found once something is opened

  • A realistic sequence, with the long-lead items named

  • A detailed written scope specific enough to compare against anyone else's

On projects where that requires a site visit and measurements, it is the paid assessment, and we say so before you agree to it: how our paid assessment works.

Start with a free 15-minute call

Tell us the address, what you are hoping to build, and whether anything has been drawn yet. In fifteen minutes we can usually tell you which jurisdiction governs it, which overlays apply, and what the first three steps should be.

Call (323) 651-0635 to book the free 15-minute consultation.

The Ultimate Pro, Inc. CA License 831700, Class B General Building. Serving Los Angeles, Riverside, Orange and San Bernardino counties since 1996.

If you are weighing work like this on your own property, the cheapest step is the first conversation. Book a free 15-minute call or call (323) 651-0635 and get a straight read on the scope, from a licensed Class B general contractor building in Southern California since 1996.

There is usually a video for this. X Plan Nation is our construction channel on YouTube, built to explain the trades to the person paying for them, not to other contractors.

Comments


Free Guide Ad 300x600.png

New Video

Featured Posts

Follow Us

  • Twitter
  • YouTube
  • Pinterest
  • Instagram
bottom of page